888集团电子游戏(中国·唯一)官方网站-BEST LOBBY

The Progress of CORNEX Lithium Battery Tianhe Airport Xiaogan Linkong Economic Zone Industrial Park

2022-03-14 Page View:28653

On March 14th, the first phase of Cornex New Energy lithium battery project which is situated on Xiaogan City Linkong Zone is in full swing. There are more than 300 operating equipment running day and night. It is the Cornex speed.


7e1614426c8ebfeeffba5a1578bacd1e_1~1.gif


Cornex new energy lithium battery Industrial Park project plans to invest 45 billion yuan in total. The total planned land area is about 3335 acres, and it is expected to enter the construction site in May this year. It will be in production by the begin early next year.


Since the project was signed in January, we always uphold the principle of " high quality and high standard" to speed up the project construction. Under the command of Xiaogan city special work team, we are guided by safety and quality, arrange construction period reasonably, manage the resources of human, materials and machinea scientifically. We strove to overcome difficulties such as outbreaks and fluctuating temperatures to promote the project operation strenuously.


As the first industry project with the largest investment amount, investment intensity and the highest technology content in Xiaogan City, Cornex actively responded to national new energy development strategy and vigorously promote to optimize industrial distribution of Hubei lithium electric industry chain. After the project completion, it will push up the multiplication development of industrial chain both new energy vehicles and spare parts. We have the responsibility to injecting strong impetus into promote the high-quality development level and build a new highland of manufacturing in the central region.

Sales Tel0086 278799977633
Recruitment Tel0086 278468517744
E-mail
AddressNO.1, Cornex Avenue, Linkong Economic Zone, Xiaogan, Hubei, China
Quick Links
Passenger Vehicles
Commercial Applications
Energy Storage